Texas data centers

Texas data centers map: water use and power, project by project

This page maps data centers in Texas and shows what each project has said in public about its water and power use. Use it to see what is near you, check if your county is on the state's investigation list, and learn what to ask.

Where are the data centers in Texas?

Gray dots are data centers that volunteers added to OpenStreetMap. Colored shapes are projects we looked up, and the shape shows the status. A dashed shape sits at a town or the middle of a county, not at the site.

Data centers near you, anywhere

Where to look

Your location stays in your browser and is rounded to about a mile. We never send it to our servers. To draw the map, your browser asks OpenStreetMap for pictures and asks us for the data centers in the area you are looking at. So both can tell roughly which area that is.

How far to look
Show on the map

These are counties, not facilities. The Attorney General's Sept. 24 announcement names counties. It does not say which projects, if any, are under review.

Skip the map and go to the list

Texas, drawn from the same data as the interactive map.

Map data © OpenStreetMap contributors. Map tiles load from openstreetmap.org only for the area you are viewing.

Tap a shape on the map to read about that project here.

  • Operating
  • Under construction
  • Proposed
  • Withdrawn
  • Dashed shape: a town or county, not the site
  • Gray dot: added to OpenStreetMap by volunteers

Is there a data center near me?

Type a town or ZIP code, or use your location. You will see the closest projects on our list, and whether you are in a county on the state's investigation list.

No data center has been publicly tied to the Attorney General's investigation. ABC 7 Amarillo, the Fort Worth Report and the Victoria Advocate each reported that the announcement named none.

Data centers near me: the same map for anywhere in the US and the world.

Your location stays in your browser. It is rounded to about a kilometer, used only to measure distances here, and never saved, sent or put in the page address. ZIP codes work in the 806 area; elsewhere, type a town.

Results appear here.

What is happening with data centers in Lubbock?

What public sources say about data centers in Lubbock County, the City's own water numbers, and the dates ahead. Below that, the rest of the 806 area code.

In Lubbock County

ProposedLubbock County · Lubbock

Project Infrared

Corva Infrastructure Services

A planned 50,000-square-foot data center near Municipal Drive and Guava, next to LP&L's Northeast Substation outside Loop 289. It would not generate power on site.

The Lubbock Economic Development Alliance (LEDA) board approved an agreement with Corva in June 2026. LEDA's president told The Texas Tribune it is "not a done deal" until Corva gets its interconnection with ERCOT through Lubbock Power & Light.

  • 6 MWStarting powerSaid by LEDA President John Osborne, describing Corva's plans, July 30, 2026
  • 27 MWMaximum powerSaid by LEDA President John Osborne, describing Corva's plans, July 30, 2026
  • 1,500 gallons a dayWater per daySaid by Corva, through a closed-loop cooling system, July 30, 2026
  • 50,000 square feetFloor areaSaid by KCBD report; The Texas Tribune uses the same size, July 30, 2026
Last checked:
WithdrawnLubbock County · Lubbock

936-acre rezoning request, Northeast Loop 289

Texas Solar Works (request filed by Hugo Reed and Associates)

A request to rezone 936 acres off Northeast Loop 289 and southeast of East Municipal Drive from mostly low-density single-family to general industrial for a large data center. No power or water figures were published.

Planning and Zoning voted 4 of 7 against the request in January 2026. LEDA's John Osborne told KCBD on Jan. 16 that the builder withdrew the request "for now" and planned to adjust it and resubmit to Planning and Zoning.

  • 936 acresLandSaid by KCBD, describing the zone change request, January 16, 2026

Not yet public: power, water use

One source onlyLast checked:
OperatingLubbock County · Lubbock

Duos Edge data center, 18th Street

Duos Technologies Group

A small "edge" data center at 1634 18th Street. Duos called it newly operational in May 2026 and invited the public to an open house on May 28. No megawatt or water figure was given.

Not yet public: power, water use

One source onlyLast checked:

How much water does the City of Lubbock have?

From the City of Lubbock's July 7, 2026 presentation on data centers.

  • Total supply capacity71.35million gallons per day
  • Average daily demand36.51million gallons per day34.8 remaining
  • Peak daily demand50.19million gallons per day21.16 remaining
  • Water used in 202513.3billion gallons
  • Today's mix61.1%groundwater38.9% surface water
  • Lake 712million gallons per day firm yield, target 2032

Source: City of Lubbock (presentation PDF), July 7, 2026. Roberts County wellfield 27.7 · Lake Meredith 5.7 · Lake Alan Henry 20 · Bailey County wellfield 18 MGD.

How big is 1,500 gallons a day?

Our arithmetic: Corva's stated 1,500 gallons a day is about 0.004 percent of the City's average daily demand of 36.51 million gallons. Put the other way, the City's average day is about 24,000 times larger. It is also 1.5 percent of the 100,000-gallons-a-day line the City suggested for discussion as "large-scale."

Corva's stated 6 MW start is 6 percent of the City's suggested 100 MW line, and its 27 MW maximum is 27 percent.

These compare a company's number with the City's numbers. They are not a forecast of what the facility will use, and no permit or meter reading is behind them.

What counts as "large-scale"?

For discussion, the City suggested that "large-scale" mean 100 megawatts or more of electricity and/or 100,000 gallons of water per day or more, primarily serving off-site users.

What did the City Council vote?

The Lubbock City Council voted 5-2 on a resolution that begins the process toward a 90-day moratorium on large-scale data centers, KCBD reported Sept. 23, 2026. City planning staff are to develop guidelines on water use, power reliability, zoning, noise and lighting, and a council work session with experts is to be scheduled within 90 days. District 6 Councilman Tim Collins voted no. KCBD

What we know

  • Project Infrared would be a 50,000-square-foot data center near Municipal Drive and Guava, next to the Northeast Substation of Lubbock Power & Light (LP&L). The board of the Lubbock Economic Development Alliance (LEDA) approved an agreement with Corva in June 2026.
  • LEDA's John Osborne said Corva plans to start at 6 MW and reach a maximum of 27 MW. Corva said it would use 1,500 gallons of water a day with closed-loop cooling.
  • A separate request to rezone 936 acres off Northeast Loop 289 lost a 4-of-7 Planning and Zoning vote in January 2026, and the builder withdrew it "for now."
  • The City suggested, for discussion, that "large-scale" mean 100 MW or more and/or 100,000 gallons a day or more.
  • The City Council voted 5-2 to begin the process toward a 90-day moratorium (a temporary pause) on large-scale data centers.

What we do not know

  • Whether Project Infrared will be built. LEDA says it still needs an interconnection with ERCOT, the Texas grid operator, through Lubbock Power & Light.
  • The exact parcel for Project Infrared, and any permit or meter reading behind the 1,500-gallon number.
  • Any power or water number for the 936-acre request. None was published.
  • Whether the builder will send the 936-acre request in again, and what the moratorium ordinance will say. KCBD reported it was being drafted.

The dates

  1. Jan. 2026Planning and Zoning votes 4 of 7 against the 936-acre rezoning request. On Jan. 16 LEDA says the builder withdrew it "for now."
  2. June 2026LEDA's board approves an agreement with Corva for Project Infrared. It becomes public in late July.
  3. July 7, 2026The City presents its water numbers and a suggested definition of "large-scale."
  4. Aug. 3, 2026Gov. Abbott directs the Public Utility Commission and ERCOT to audit data centers that advance through interconnection.
  5. Sept. 14, 2026Gov. Abbott directs the Water Development Board to enforce the water use survey against data centers that did not return it.
  6. Sept. 23, 2026KCBD reports the Lubbock City Council voted 5-2 to begin the process toward a 90-day moratorium. A day later the Attorney General announces his investigation.
  7. Oct. 14, 2026AheadThe Water Development Board owes the Governor's office an update on its enforcement.
  8. Within 90 days of the resolutionAheadA council work session where experts brief members on data center impacts, and city staff guidelines on water, power, zoning, noise and lighting.

Sources: City of Lubbock presentation (July 7, 2026); KCBD (Jan. 16, July 30 and Sept. 23, 2026); The Texas Tribune (July 29, 2026); the Governor's and Attorney General's releases.

What about the rest of the 806?

The 806 area code reaches from Lubbock to the Panhandle. These are the projects we found in it, outside Lubbock County. Aligned's Project Caprock is in Hale County, outside Abernathy. TeraWulf and Fluidstack's Abernathy project names the town and no county; Abernathy sits in both Hale and Lubbock counties.

Under constructionHale County · Outside Abernathy

Project Caprock

Aligned Data Centers

A six-building campus just outside Abernathy, in Hale County, not Lubbock County. Aligned says its closed-loop cooling design recirculates the same water and protects the Ogallala Aquifer. Hale County is not among the counties named in the Attorney General's announcement.

Aligned announced a groundbreaking on April 9, 2026. It lists the first facility, LBB-01, as anticipated in service in the first quarter of 2027.

  • 540 MWPowerSaid by Aligned Data Centers, April 9, 2026
  • 313 acresLandSaid by Aligned Data Centers, April 9, 2026
  • 1,650,000 square feetFloor areaSaid by Aligned Data Centers (1.65 million square feet of capacity across six facilities), April 9, 2026

Not yet public: water use

One source onlyLast checked:
ProposedCounty not stated · Abernathy

Abernathy campus joint venture

TeraWulf and Fluidstack

A joint venture, 51 percent owned by TeraWulf, to develop a data center campus at Abernathy, with room for later phases.

The release names Abernathy, Texas, and no county. The town sits in both Hale and Lubbock counties, so this record is not counted in either.

TeraWulf announced the joint venture on Oct. 28, 2025. The release does not say whether construction has started.

  • 168 MWPowerSaid by TeraWulf (critical IT load for the first phase), October 28, 2025

Not yet public: water use

Last checked:
OperatingDickens County

Helios campus

Galaxy Digital

A West Texas campus in Dickens County. Galaxy says Phase I is delivered and earning revenue, and that civil and structural work on a 260 MW Phase II is underway.

Galaxy said on July 6, 2026 that it had delivered the first phase. Later phases are under development.

  • 133 MWPower delivered so farSaid by Galaxy (critical IT load, Phase I; about 200 MW gross), July 6, 2026
  • 260 MWPower, next phaseSaid by Galaxy (critical IT load, Phase II), July 6, 2026
  • 800 MWGross power approved and contractedSaid by Galaxy (gross power approved and contracted), July 6, 2026

Not yet public: water use

Last checked:
Under constructionCarson County · Near Amarillo

Project Matador (HyperGrid campus)

Fermi America

A private-power campus beside the Pantex plant in Carson County, near Amarillo, billed as the largest data center in the world. The City of Amarillo says it is not a City project, though it has discussed infrastructure and utility services. On Oct. 28, 2025 the Amarillo City Council voted to authorize a water supply agreement for up to 2.5 million gallons a day, with Fermi paying twice the in-city commercial rate. An earlier proposal before the vote had mentioned up to 5.5 million. Residents have opposed the project, according to Spectrum News 1. Carson County is not among the counties named in the Attorney General's announcement.

Site work was underway in 2025. KFDA reported on Feb. 6, 2026 that Fermi confirmed construction was paused while it waited for a final air permit. Fermi's release dated Feb. 25, 2026 says the Texas Commission on Environmental Quality gave final approval of the permit. Fermi's Aug. 13, 2026 results release says the site is "ready to shift to vertical construction on customer timelines." No source we found ties this project to the Governor's Sept. 21 permit directive or to the Water Development Board survey.

  • 11 GWPowerSaid by Fermi America (campus size, "private grid"), October 29, 2025
  • 5,236 acresLandSaid by Amarillo Tribune (Spectrum News 1 calls it "nearly 6,000" acres), October 29, 2025
  • 2,500,000 gallons a dayWater in a supply agreement, per day (up to)Said by City of Amarillo final water supply agreement, section 7.01: maximum rate of delivery, "up to," no annual cap stated, October 30, 2025
Last checked:
Under constructionPotter County · Amarillo

Duos Edge data center, Amarillo

Duos Technologies Group

Duos' second small "edge" data center in the Amarillo market, on Potter County land next to the largest colocation facility in the Texas Panhandle. No megawatt or water figure was given.

In its March 19, 2026 release Duos said the unit is "expected to be fully operational in the coming months."

Not yet public: power, water use

One source onlyLast checked:
ProposedArmstrong County

Armstrong County campus

Google

Google named Armstrong County, south of Amarillo, as the site of one new data center campus. The $40 billion covers its Texas plans overall, not this site alone.

Announced Nov. 14, 2025 as part of a $40 billion Texas investment through 2027. The post does not say construction has started.

Not yet public: power, water use

One source onlyLast checked:
ProposedKent County · Jayton

Project Hyper spur buildings (Jayton)

Two single-story data center buildings of 759,262 square feet each, listed at Country Road 233 and P2390 near Jayton. Each is estimated at $2.4 billion, with construction starting in January 2027 and finishing in mid-2029. The filings give no power or water figures.

Two state project registrations dated Oct. 1, 2026 list the buildings. They name two LLCs as owners and no tenant. Data Center Dynamics reports that Crusoe filed them; the filings do not say so. Separately, the Texas Spur reports that Kent County commissioners voted June 8, 2026 to take a first step toward tax talks with Crusoe on a Kent County data center. No source we found says whether that is the same project.

  • 759,262 square feetFloor areaSaid by Owner, on each TDLR registration (per building), October 1, 2026

Not yet public: power, water use

Last checked:

Of the 18 counties on the Attorney General's list, three are in the 806 area code: Lubbock, Potter (Amarillo) and Randall. Carson County, where Project Matador sits, and Hale County, where Project Caprock sits, are not among the 18. The announcement names counties, not facilities, and does not identify Project Matador, Project Caprock or any other project on this page as under review.

Which Texas counties are on the state's data center investigation list?

On Sept. 24, 2026, the Texas Attorney General said data centers are under initial investigation in counties "including" these 18: Harris, Montgomery, Travis, Dallas, Tarrant, Smith, Bexar, Tom Green, Potter, Randall, Lubbock, Midland, Ector, Wichita, Victoria, Brazos, Nueces, El Paso. The release names counties and no facilities. A shape on the map in one of those counties does not mean that project is among those under review, and a project outside them is not shown to be clear.

Open a county page to see its projects and what to ask:

On the state's investigation list

What the state has said about data center water reporting

Three state statements from September 2026, and the statute behind them.

  • Texas Water Code 16.012: a person who fails to timely complete and return the Water Development Board's survey is not eligible for funding from the board and is ineligible for certain permits from the Texas Commission on Environmental Quality, and the failure is a Class C misdemeanor. The board's survey covers operational facilities, not planned or under-construction ones, and is due March 1.
  • Sept. 14, 2026: Gov. Greg Abbott directed the Water Development Board to use its enforcement authority against data centers that did not return the survey, and to update his office by Oct. 14, 2026. His release also recounts an Aug. 3, 2026 directive for the Public Utility Commission and ERCOT to audit data centers that advance through the interconnection process.
  • Sept. 21, 2026: the Governor directed the Texas Commission on Environmental Quality to halt all permits sought by data centers until ERCOT completes its audit, with an update due Oct. 19, and said he will work with the Legislature next session to eliminate financial incentives for data centers.
  • Sept. 24, 2026: Attorney General Ken Paxton announced an investigation of data center developments that have not responded to the survey, saying his office is looking at "hundreds."

Sources: Texas Attorney General (September 24, 2026) · Office of the Texas Governor (September 14, 2026) · Texas Water Code §16.012 (text via Public.Law) (October 2, 2026) · Texas Water Development Board (October 2, 2026)

What has each project said about water and power?

One row per project. Each box shows what a company, city or state agency has said in public about that item, who said it and when.

"Not yet public" means we looked in company releases, government pages and news reports and did not find it. It may exist and we missed it. It is not a judgment about any company. If you have a source, send it with the form at the bottom of the page.

Showing 22 of 22 projects

Scroll sideways to see every column. The project name stays in view.

936-acre rezoning request, Northeast Loop 289WithdrawnLubbockNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Abernathy campus joint ventureProposedNot statedNot yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answerPower: 168 MWSaid by TeraWulf (critical IT load for the first phase), October 28, 2025Not yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Abilene campus (first phase)OperatingTaylorNot yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answerProjected power, full site: 2.1 GWSaid by Crusoe (projected, full Abilene site), March 27, 2026Not yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Abilene second campus (900 MW)Under constructionTaylorNot yet public: water use, water source, water deal or tax break, state permits, state water survey answerPower: 900 MWSaid by Crusoe, March 27, 2026Not yet publicClosed-loop, non-evaporative liquid cooling.Said by Crusoe, March 27, 2026Not yet publicNot yet publicNot yet publicNot yet public
Armstrong County campusProposedArmstrongNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Barber Lake siteUnder constructionMitchellNot yet public: water use, state permits, state water survey answerPower: 300 MWSaid by Cipher Mining (capacity Fluidstack will lease at the site), November 20, 2025Not yet publicClosed-loop systems using non-potable water.Said by San Angelo LIVE, September 11, 2026On-site non-potable water only. Cipher says it will not draw from municipal drinking-water sources, and the mayor has said the data center is not a city water customer.Said by Cipher and Mayor Ruben Hurt, as reported by San Angelo LIVE, September 11, 2026The companies created the Colorado City Infrastructure Fund, a 501(c)(3), to pay for water-system repairs in the town.Said by San Angelo LIVE, September 11, 2026Not yet publicNot yet public
Colchis siteProposedTom GreenNot yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answerPower: 1 GWSaid by San Angelo LIVE, describing the planned size, September 21, 2026Not yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Duos Edge data center, 18th StreetOperatingLubbockNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Duos Edge data center, AmarilloUnder constructionPotterNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
El Paso data centerUnder constructionEl PasoNot yet public: water use, water source, water deal or tax break, state permits, state water survey answerPower: 1 GWSaid by Meta, March 26, 2026Not yet publicA closed-loop system that recirculates the same water, with "no operational water use for a majority of the year."Said by Meta, October 15, 2025Not yet publicNot yet publicNot yet publicNot yet public
Frontier campusUnder constructionShackelfordNot yet public: water use, water source, water deal or tax break, state permits, state water survey answerPower: 1.4 GWSaid by Vantage Data Centers, August 19, 2025Not yet publicA closed-loop chiller system that "requires minimal water."Said by Vantage Data Centers, August 19, 2025Not yet publicNot yet publicNot yet publicNot yet public
Haskell County campusProposedHaskellNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Helios campusOperatingDickensNot yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answerPower delivered so far: 133 MW · Power, next phase: 260 MW · Gross power approved and contracted: 800 MWSaid by Galaxy (critical IT load, Phase I; about 200 MW gross) +, July 6, 2026Not yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Horizon campusOperatingChildressNot yet public: water use, water source, water deal or tax break, state permits, state water survey answerPower delivered so far: 50 MW · Power: 750 MWSaid by IREN, as reported by DCD (IT load, first building) +, August 17, 2026Not yet publicDirect-to-chip liquid cooling in each building.Said by DCD, describing the buildings, August 17, 2026Not yet publicNot yet publicNot yet publicNot yet public
Milam County campusProposedMilamNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Project CaprockUnder constructionHaleNot yet public: water use, water source, water deal or tax break, state permits, state water survey answerPower: 540 MWSaid by Aligned Data Centers, April 9, 2026Not yet publicLiquid cooling with an air-cooled heat rejection system and a closed-loop design that recirculates the same water.Said by Aligned Data Centers, April 9, 2026Not yet publicNot yet publicNot yet publicNot yet public
Project Hyper spur buildings (Jayton)ProposedKentNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Project InfraredProposedLubbockNot yet public: water source, state permits, state water survey answerStarting power: 6 MW · Maximum power: 27 MWSaid by LEDA President John Osborne, describing Corva's plans +, July 30, 2026Water per day: 1,500 gallons a daySaid by Corva, through a closed-loop cooling system, July 30, 2026Closed-loop cooling.Said by Corva, as reported by KCBD, July 30, 2026Not yet publicThe LEDA board approved an agreement with Corva in June 2026. The terms were not in the reporting we found.Said by KCBD, July 30, 2026Not yet publicNot yet public
Project Matador (HyperGrid campus)Under constructionCarsonNot yet public: state water survey answerPower: 11 GWSaid by Fermi America (campus size, "private grid"), October 29, 2025Water in a supply agreement, per day (up to): 2,500,000 gallons a daySaid by City of Amarillo final water supply agreement, section 7.01: maximum rate of delivery, "up to," no annual cap stated, October 30, 2025Hybrid air and water cooling is planned for the four large power generators, with an estimated 13.2 million gallons a day across the four, according to the Amarillo Tribune's report of Fermi's plans. This is for the generators, not the data halls.Said by Amarillo Tribune, reporting Fermi's plans, October 29, 2025City of Amarillo supply: the final agreement sets a maximum delivery of 2.5 million gallons a day and states no annual cap. Fermi is to pay for the wells, piping and other improvements it needs to receive the water.Said by City of Amarillo final water supply agreement, section 7.01, October 30, 2025Carson County approved a 10-year tax abatement and reinvestment zone. The Amarillo City Council voted on Oct. 28, 2025 to authorize a 20-year water supply agreement for up to 2.5 million gallons a day, with Fermi paying twice the in-city commercial rate.Said by Fermi America (Carson County); Amarillo Tribune (Amarillo vote), October 29, 2025Fermi's release dated Feb. 25, 2026 says the Texas Commission on Environmental Quality gave final approval of an air permit for 6 GW of gas-fired power generation. A permit number was not in the reporting we found.Said by Fermi America, February 25, 2026Not yet public
Site northeast of San AngeloProposedTom GreenNot yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Texas Critical Data CentersProposedEctorNot yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answerPower: 250 MWSaid by Data Center Frontier, describing the joint venture's aim, May 16, 2025Not yet publicNot yet publicNot yet publicNot yet publicNot yet publicNot yet public
Westline site (Dove Creek Technology Campus)ProposedTom GreenNot yet public: power, water use, water deal or tax break, state permits, state water survey answerNot yet publicNot yet publicA closed-loop cooling system.Said by Beacon Data Centers, as reported by San Angelo LIVE, June 2, 2026An on-site well for drinking water. Beacon also described removing mesquite trees to free up water and evaluating brackish water with on-site desalination.Said by Beacon Data Centers, as reported by San Angelo LIVE, June 2, 2026Not yet publicNot yet publicNot yet public

No public list shows which projects returned the state water survey, so every project reads "Not yet public" for that item. Projects were last checked October 2, 2026. The OpenStreetMap dots reflect data as of October 13, 2026.

Want a number that is not public yet? You can ask for it. Write a public records request

How many data centers answered the state water survey? KUT reported on June 26, 2026 that 17% of data centers answered the 2025 survey, and that the number surveyed grew from 22 in 2023 to 341 in 2025, according to the Water Development Board's Temple McKinnon at a June legislative hearing. The Texas Tribune reported on Sept. 14 that as few as 28% responded over three years. These are statewide numbers, not a list of who answered. KUT · Texas Tribune

How much water is that?

Pick a number a company or agency gave in gallons a day, and compare it with everyday water use from the City of Lubbock's July 7, 2026 slide. Or type your own number.

Our math from the City's figures

Project Infrared: stated water use is about 0.252% of Regal Park (a Lubbock water customer).

  • Formula: 1,500 ÷ 595,612 = 0.0025 (0.252%)
  • 1,500 gallons a day × 365 days = 547,500 gallons a year, if the number held every day.
  • For scale, 0.0041% of the City's average demand of 36,510,000 gallons a day. The City used 13.3 billion gallons in 2025.

Benchmarks are the City's average gallons per day for each customer, as shown in its July 7, 2026 deck. A company's number is not a measurement, and an "up to" supply number is a cap, not a forecast.

Source: City of Lubbock (presentation PDF), July 7, 2026.

Every Texas data center project we track

Each project shows its status, what a source said about it, who said it and when, plus links to the sources. "Said" means the named company or agency said it. It is not a measurement or a permit.

  • OperatingA source says the building is open, has power or was delivered.
  • Under constructionA source says ground was broken, site work is underway, or construction is in progress.
  • ProposedAnnounced, approved for a deal, or presented to a board. No source we checked says construction has started.
  • WithdrawnThe applicant withdrew the request.

Operating (4)

OperatingLubbock County · Lubbock

Duos Edge data center, 18th Street

Duos Technologies Group

A small "edge" data center at 1634 18th Street. Duos called it newly operational in May 2026 and invited the public to an open house on May 28. No megawatt or water figure was given.

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:
OperatingDickens County

Helios campus

Galaxy Digital

A West Texas campus in Dickens County. Galaxy says Phase I is delivered and earning revenue, and that civil and structural work on a 260 MW Phase II is underway.

Galaxy said on July 6, 2026 that it had delivered the first phase. Later phases are under development.

  • 133 MWPower delivered so farSaid by Galaxy (critical IT load, Phase I; about 200 MW gross), July 6, 2026
  • 260 MWPower, next phaseSaid by Galaxy (critical IT load, Phase II), July 6, 2026
  • 800 MWGross power approved and contractedSaid by Galaxy (gross power approved and contracted), July 6, 2026

Not yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

Last checked:
OperatingChildress County · Childress

Horizon campus

IREN

A campus where the first of four 50 MW buildings has been delivered. DCD reports a five-year, $9.7 billion cloud services contract with Microsoft signed in November 2025.

DCD calls it the Childress campus; no county is given, so the marker sits at the town of Childress.

DCD reported Aug. 17, 2026 that IREN delivered its first building to a customer. Three more are scheduled this year.

  • 50 MWPower delivered so farSaid by IREN, as reported by DCD (IT load, first building), August 17, 2026
  • 750 MWPowerSaid by DCD, at full build-out, August 17, 2026
  • 576 acresLandSaid by DCD, at full build-out, August 17, 2026

More that has been said

Cooling
Direct-to-chip liquid cooling in each building.Said by DCD, describing the buildings, August 17, 2026

Not yet public: water use, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:
OperatingTaylor County · Abilene

Abilene campus (first phase)

Crusoe

The existing Abilene campus. Crusoe puts the projected capacity of the full Abilene site, including the next campus below, at 2.1 GW.

Crusoe said on March 27, 2026 that it had energized the first two buildings in under a year.

  • 2.1 GWProjected power, full siteSaid by Crusoe (projected, full Abilene site), March 27, 2026

Not yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:

Under construction (7)

Under constructionHale County · Outside Abernathy

Project Caprock

Aligned Data Centers

A six-building campus just outside Abernathy, in Hale County, not Lubbock County. Aligned says its closed-loop cooling design recirculates the same water and protects the Ogallala Aquifer. Hale County is not among the counties named in the Attorney General's announcement.

Aligned announced a groundbreaking on April 9, 2026. It lists the first facility, LBB-01, as anticipated in service in the first quarter of 2027.

  • 540 MWPowerSaid by Aligned Data Centers, April 9, 2026
  • 313 acresLandSaid by Aligned Data Centers, April 9, 2026
  • 1,650,000 square feetFloor areaSaid by Aligned Data Centers (1.65 million square feet of capacity across six facilities), April 9, 2026

More that has been said

Cooling
Liquid cooling with an air-cooled heat rejection system and a closed-loop design that recirculates the same water.Said by Aligned Data Centers, April 9, 2026

Not yet public: water use, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

One source onlyLast checked:
Under constructionCarson County · Near Amarillo

Project Matador (HyperGrid campus)

Fermi America

A private-power campus beside the Pantex plant in Carson County, near Amarillo, billed as the largest data center in the world. The City of Amarillo says it is not a City project, though it has discussed infrastructure and utility services. On Oct. 28, 2025 the Amarillo City Council voted to authorize a water supply agreement for up to 2.5 million gallons a day, with Fermi paying twice the in-city commercial rate. An earlier proposal before the vote had mentioned up to 5.5 million. Residents have opposed the project, according to Spectrum News 1. Carson County is not among the counties named in the Attorney General's announcement.

Site work was underway in 2025. KFDA reported on Feb. 6, 2026 that Fermi confirmed construction was paused while it waited for a final air permit. Fermi's release dated Feb. 25, 2026 says the Texas Commission on Environmental Quality gave final approval of the permit. Fermi's Aug. 13, 2026 results release says the site is "ready to shift to vertical construction on customer timelines." No source we found ties this project to the Governor's Sept. 21 permit directive or to the Water Development Board survey.

  • 11 GWPowerSaid by Fermi America (campus size, "private grid"), October 29, 2025
  • 5,236 acresLandSaid by Amarillo Tribune (Spectrum News 1 calls it "nearly 6,000" acres), October 29, 2025
  • 2,500,000 gallons a dayWater in a supply agreement, per day (up to)Said by City of Amarillo final water supply agreement, section 7.01: maximum rate of delivery, "up to," no annual cap stated, October 30, 2025

More that has been said

Cooling
Hybrid air and water cooling is planned for the four large power generators, with an estimated 13.2 million gallons a day across the four, according to the Amarillo Tribune's report of Fermi's plans. This is for the generators, not the data halls.Said by Amarillo Tribune, reporting Fermi's plans, October 29, 2025
Water source
City of Amarillo supply: the final agreement sets a maximum delivery of 2.5 million gallons a day and states no annual cap. Fermi is to pay for the wells, piping and other improvements it needs to receive the water.Said by City of Amarillo final water supply agreement, section 7.01, October 30, 2025
Water deal or tax break
Carson County approved a 10-year tax abatement and reinvestment zone. The Amarillo City Council voted on Oct. 28, 2025 to authorize a 20-year water supply agreement for up to 2.5 million gallons a day, with Fermi paying twice the in-city commercial rate.Said by Fermi America (Carson County); Amarillo Tribune (Amarillo vote), October 29, 2025
State permits
Fermi's release dated Feb. 25, 2026 says the Texas Commission on Environmental Quality gave final approval of an air permit for 6 GW of gas-fired power generation. A permit number was not in the reporting we found.Said by Fermi America, February 25, 2026

Not yet public: state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

Last checked:
Under constructionPotter County · Amarillo

Duos Edge data center, Amarillo

Duos Technologies Group

Duos' second small "edge" data center in the Amarillo market, on Potter County land next to the largest colocation facility in the Texas Panhandle. No megawatt or water figure was given.

In its March 19, 2026 release Duos said the unit is "expected to be fully operational in the coming months."

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:
Under constructionMitchell County · Colorado City

Barber Lake site

Cipher Mining (now Cipher Digital)

A site just outside Colorado City where Cipher says its customer Fluidstack will lease the full 300 MW of capacity. Cipher says the plant uses on-site non-potable water only, and the mayor has said the data center is not a city water customer.

San Angelo LIVE reported on Sept. 11, 2026 that the 300 MW campus just outside Colorado City was slated to begin delivering capacity that week. Cipher's Nov. 20, 2025 release describes signed leases and capacity it is developing.

  • 300 MWPowerSaid by Cipher Mining (capacity Fluidstack will lease at the site), November 20, 2025

More that has been said

Cooling
Closed-loop systems using non-potable water.Said by San Angelo LIVE, September 11, 2026
Water source
On-site non-potable water only. Cipher says it will not draw from municipal drinking-water sources, and the mayor has said the data center is not a city water customer.Said by Cipher and Mayor Ruben Hurt, as reported by San Angelo LIVE, September 11, 2026
Water deal or tax break
The companies created the Colorado City Infrastructure Fund, a 501(c)(3), to pay for water-system repairs in the town.Said by San Angelo LIVE, September 11, 2026

Not yet public: water use, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

Last checked:
Under constructionTaylor County · Abilene

Abilene second campus (900 MW)

Crusoe

Two new buildings and an on-site power plant next to the existing Abilene campus. Crusoe says the work is for Microsoft and the cooling is closed-loop and non-evaporative.

Crusoe said land clearing and site preparation were underway on March 27, 2026, with the first building expected to be energized in mid-2027.

  • 900 MWPowerSaid by Crusoe, March 27, 2026

More that has been said

Cooling
Closed-loop, non-evaporative liquid cooling.Said by Crusoe, March 27, 2026

Not yet public: water use, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:
Under constructionShackelford County

Frontier campus

Vantage Data Centers

A 10-building campus. Vantage says it will use a closed-loop chiller system that "requires minimal water." It gave no gallon figure.

Vantage said on Aug. 19, 2025 that construction had begun, with the first building scheduled for delivery in the second half of 2026.

  • 1.4 GWPowerSaid by Vantage Data Centers, August 19, 2025
  • 1,200 acresLandSaid by Vantage Data Centers, August 19, 2025
  • 3,700,000 square feetFloor areaSaid by Vantage Data Centers (10 data centers), August 19, 2025

More that has been said

Cooling
A closed-loop chiller system that "requires minimal water."Said by Vantage Data Centers, August 19, 2025

Not yet public: water use, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

One source onlyLast checked:
Under constructionEl Paso County · El Paso

El Paso data center

Meta

Meta says it will cool the facility with a closed-loop system that recirculates water, with "no operational water use for a majority of the year." It gave no gallon figure.

Meta announced a groundbreaking on Oct. 15, 2025, and updated the post on March 26, 2026 to say the facility will grow to 1 gigawatt.

  • 1 GWPowerSaid by Meta, March 26, 2026

More that has been said

Cooling
A closed-loop system that recirculates the same water, with "no operational water use for a majority of the year."Said by Meta, October 15, 2025

Not yet public: water use, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

  • Meta (newsroom) · · backs up: announcement, status, power figure, water
One source onlyLast checked:

Proposed (10)

ProposedLubbock County · Lubbock

Project Infrared

Corva Infrastructure Services

A planned 50,000-square-foot data center near Municipal Drive and Guava, next to LP&L's Northeast Substation outside Loop 289. It would not generate power on site.

The Lubbock Economic Development Alliance (LEDA) board approved an agreement with Corva in June 2026. LEDA's president told The Texas Tribune it is "not a done deal" until Corva gets its interconnection with ERCOT through Lubbock Power & Light.

  • 6 MWStarting powerSaid by LEDA President John Osborne, describing Corva's plans, July 30, 2026
  • 27 MWMaximum powerSaid by LEDA President John Osborne, describing Corva's plans, July 30, 2026
  • 1,500 gallons a dayWater per daySaid by Corva, through a closed-loop cooling system, July 30, 2026
  • 50,000 square feetFloor areaSaid by KCBD report; The Texas Tribune uses the same size, July 30, 2026

More that has been said

Water deal or tax break
The LEDA board approved an agreement with Corva in June 2026. The terms were not in the reporting we found.Said by KCBD, July 30, 2026

Not yet public: water source, state permits, state water survey answer

Pin placed near the site as described. Approximate. Pin placed at the Northeast Substation as mapped in OpenStreetMap (© OpenStreetMap contributors). No parcel has been published, so treat it as within about a mile.

Sources

  • KCBD · · backs up: announcement, power figure, water, size, location, status
  • The Texas Tribune · · backs up: status, size
Last checked:
ProposedCounty not stated · Abernathy

Abernathy campus joint venture

TeraWulf and Fluidstack

A joint venture, 51 percent owned by TeraWulf, to develop a data center campus at Abernathy, with room for later phases.

The release names Abernathy, Texas, and no county. The town sits in both Hale and Lubbock counties, so this record is not counted in either.

TeraWulf announced the joint venture on Oct. 28, 2025. The release does not say whether construction has started.

  • 168 MWPowerSaid by TeraWulf (critical IT load for the first phase), October 28, 2025

Not yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

Last checked:
ProposedArmstrong County

Armstrong County campus

Google

Google named Armstrong County, south of Amarillo, as the site of one new data center campus. The $40 billion covers its Texas plans overall, not this site alone.

Announced Nov. 14, 2025 as part of a $40 billion Texas investment through 2027. The post does not say construction has started.

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

  • Google (blog) · · backs up: announcement, county
One source onlyLast checked:
ProposedHaskell County

Haskell County campus

Google

Google named Haskell County for two new data centers, one of them to be built alongside a new solar and battery storage plant.

Announced Nov. 14, 2025. The post does not say construction has started.

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

  • Google (blog) · · backs up: announcement, county
One source onlyLast checked:
ProposedKent County · Jayton

Project Hyper spur buildings (Jayton)

Two single-story data center buildings of 759,262 square feet each, listed at Country Road 233 and P2390 near Jayton. Each is estimated at $2.4 billion, with construction starting in January 2027 and finishing in mid-2029. The filings give no power or water figures.

Two state project registrations dated Oct. 1, 2026 list the buildings. They name two LLCs as owners and no tenant. Data Center Dynamics reports that Crusoe filed them; the filings do not say so. Separately, the Texas Spur reports that Kent County commissioners voted June 8, 2026 to take a first step toward tax talks with Crusoe on a Kent County data center. No source we found says whether that is the same project.

  • 759,262 square feetFloor areaSaid by Owner, on each TDLR registration (per building), October 1, 2026

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

Last checked:
ProposedMilam County

Milam County campus

SB Energy

A $3 billion data center campus planned by SB Energy, a SoftBank affiliate, about 70 miles northeast of Austin, according to the Statesman. No megawatt or water figure was in the article.

The Austin American-Statesman reported the plan on Sept. 29, 2025. The article does not say construction has started.

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

One source onlyLast checked:
ProposedEctor County · Near Odessa

Texas Critical Data Centers

New Era Helium and Sharon AI (joint venture)

A planned natural-gas-powered campus near Odessa, in Ector County.

The figures below are from May 2025 reporting. The project has been described at larger sizes since; check the developer for current numbers.

  • 250 MWPowerSaid by Data Center Frontier, describing the joint venture's aim, May 16, 2025
  • 235 acresLandSaid by Data Center Frontier, describing the planned site, May 16, 2025

Not yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

One source onlyLast checked:
ProposedTom Green County · Northeast of San Angelo

Colchis site

Cipher Digital

A planned data center on private land off Highway 67 North near City Farm Road, northeast of San Angelo.

San Angelo LIVE reported on Sept. 21, 2026 that a Cipher Digital representative was scheduled to brief the Tom Green County Commissioners Court the next day.

  • 1 GWPowerSaid by San Angelo LIVE, describing the planned size, September 21, 2026

Not yet public: water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

  • San Angelo LIVE · · backs up: announcement, power figure, location, status
One source onlyLast checked:
ProposedTom Green County · South of San Angelo

Westline site (Dove Creek Technology Campus)

Beacon Data Centers

A proposed campus near South FM 2335 and U.S. Highway 67 South. Beacon described a closed-loop cooling system and an on-site well for drinking water, and said it would evaluate brackish water with on-site desalination.

Beacon presented the project to the Tom Green County Commissioners Court in early June 2026. At the same meeting, commissioners voted against a 12-month moratorium on large data centers and energy facilities.

  • 1,240 acresLandSaid by Beacon Data Centers, as reported by San Angelo LIVE (buildable land, about 70 percent of the total), June 2, 2026

More that has been said

Water source
An on-site well for drinking water. Beacon also described removing mesquite trees to free up water and evaluating brackish water with on-site desalination.Said by Beacon Data Centers, as reported by San Angelo LIVE, June 2, 2026

Not yet public: power, water use, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

  • San Angelo LIVE · · backs up: announcement, land, water, status, location
One source onlyLast checked:
ProposedTom Green County · Northeast of San Angelo

Site northeast of San Angelo

Skybox Datacenters

An early-stage interest in a site northeast of San Angelo, per local reporting. No size or water figure was given.

San Angelo LIVE reported on April 8, 2026 that Skybox was "potentially looking into" a site near U.S. Highway 67 North. No later source was checked.

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed at the named town. This is not the site.

Sources

  • San Angelo LIVE · · backs up: announcement, location, status
One source onlyLast checked:

Withdrawn (1)

WithdrawnLubbock County · Lubbock

936-acre rezoning request, Northeast Loop 289

Texas Solar Works (request filed by Hugo Reed and Associates)

A request to rezone 936 acres off Northeast Loop 289 and southeast of East Municipal Drive from mostly low-density single-family to general industrial for a large data center. No power or water figures were published.

Planning and Zoning voted 4 of 7 against the request in January 2026. LEDA's John Osborne told KCBD on Jan. 16 that the builder withdrew the request "for now" and planned to adjust it and resubmit to Planning and Zoning.

  • 936 acresLandSaid by KCBD, describing the zone change request, January 16, 2026

Not yet public: power, water use, cooling, water source, water deal or tax break, state permits, state water survey answer

Marker placed near the middle of the county. This is not the site.

Sources

  • KCBD · · backs up: announcement, land, votes, status, location
One source onlyLast checked:
Data centers added to OpenStreetMap

The gray dots on the map, as a list. Volunteers add these, so coverage is incomplete, and one campus can show up as many items. Names are as volunteers typed them.

Loading the list.

Download the data

The list is free to use. Download it, check it, cite it.

License

Free to share and print with credit to 806 Connect (CC BY 4.0). That covers the parts we wrote: the list, statuses, notes, the numbers sources gave with who said them, and the water-and-power table. The text of the sources stays with its publishers. The OpenStreetMap dots are not in these files; they are © OpenStreetMap contributors under the Open Database License. CC BY 4.0

Each project has an id that matches the figures file and the page anchors. Coordinates are approximate; see location_precision.

Cite this dataset

806 Connect. "Texas Data Center Water Watch" [dataset], last checked October 2, 2026. https://806connect.com/data-centers

Source documents and key dates

The main documents behind this page, each with a one-sentence summary, and the state's dates in order.

Which projects are under investigation? The Attorney General's announcement names counties, not facilities. ABC 7 Amarillo, the Fort Worth Report and the Victoria Advocate each reported that it did not identify the developments under investigation in their counties. No project on this page has been publicly tied to it.

  • Texas Attorney General · Published

    Attorney General: investigation of data center developments

    Says the office is investigating developments that have not answered the Water Development Board's water use survey, and lists 18 counties where data centers are under initial investigation. It names no facilities.

    Open the document
  • Office of the Texas Governor · Published

    Governor: directs TWDB to penalize reporting failures

    Directs the Water Development Board to use its enforcement authority against data centers that did not return the survey, and to update the Governor's office by Oct. 14, 2026.

    Open the document
  • Office of the Texas Governor · Published

    Governor: comprehensive data center audit

    Directs the Public Utility Commission and ERCOT to audit data centers that advance through the interconnection process, including water use and public financial assistance, and to deny connection to projects that do not comply.

    Open the document
  • Office of the Texas Governor · Published

    Governor: halt on data center permits at TCEQ

    Directs the Texas Commission on Environmental Quality to halt all permits sought by data centers until ERCOT completes its audit, asks for an update by Oct. 19, 2026, and says the Governor will work with the Legislature next session to eliminate financial incentives for data centers.

    Open the document
  • Texas Water Development Board · Opened

    Water Use Survey

    The state's annual survey of water use at operational facilities, due March 1. Says anyone who receives the notification letter is required by law to submit it.

    Open the document
  • Texas Water Code (text via Public.Law) · Opened

    Texas Water Code, Section 16.012

    The statute behind the survey: not returning it makes a person ineligible for board funding and certain permits, and is a Class C misdemeanor. (The same text on statutes.capitol.texas.gov did not load for us.)

    Open the document
  • KUT (Austin) · Published

    KUT: lawmakers hear how many data centers answered the survey

    Reports that 17% of data centers answered the 2025 survey, and that the number surveyed grew from 22 in 2023 to 341 in 2025, per the Water Development Board's Temple McKinnon at a June 2026 legislative hearing.

    Open the document
  • The Texas Tribune · Published

    Texas Tribune: Abbott orders water survey enforcement

    Reports survey response rates by year, including that as few as 28% of data centers responded in the last three years.

    Open the document
  • KVII ABC 7 Amarillo · Published

    ABC 7 Amarillo: Potter and Randall counties on the list

    Reports that the Attorney General's office did not identify the developments under investigation in Potter and Randall counties.

    Open the document
  • Fort Worth Report · Published

    Fort Worth Report: Tarrant County on the list

    Reports that the release does not specify which Tarrant County data centers are being investigated.

    Open the document
  • Victoria Advocate · Published

    Victoria Advocate: Victoria County on the list

    Reports that the Sept. 24 announcement did not identify a specific Victoria County project.

    Open the document
  • City of Lubbock · Published

    City of Lubbock: public meeting on large-scale data centers

    The City's slides: a suggested definition of "large-scale," its water supply and demand, and average daily water use for several customers and an example data center.

    Open the document
  • City of Amarillo (PDF) · Published

    City of Amarillo: final Fermi water supply agreement

    Section 7.01 sets a maximum rate of delivery of 2.5 million gallons a day. We found no annual cap in the text.

    Open the document
  • City of Amarillo · Opened

    City of Amarillo: Fermi project updates

    The City's page on its role in the Fermi project, with the council presentation, agreements and an FAQ on the water supply agreement.

    Open the document
  • Fermi America (press release) · Published

    Fermi America: partnerships with Amarillo and Carson County

    Fermi's account of the 10-year Carson County tax abatement and the Amarillo water supply agreement of up to 2.5 million gallons a day.

    Open the document
  • Aligned Data Centers (press release) · Published

    Aligned Data Centers: Project Caprock groundbreaking

    The 540 MW, 313-acre Hale County campus: size, six facilities, the first in service expected in the first quarter of 2027, and its closed-loop cooling design.

    Open the document

State timeline

  1. Governor directs the Public Utility Commission and ERCOT to audit data centers that advance through interconnection. Source
  2. Governor directs the Water Development Board to enforce the water use survey against data centers that did not return it. Source
  3. Governor directs the Texas Commission on Environmental Quality to halt all permits sought by data centers until ERCOT completes its audit, and says he will work with the Legislature next session to eliminate financial incentives for data centers. TCEQ owes an update by Oct. 19. Source
  4. Attorney General announces an investigation of developments that have not responded to the survey, naming 18 counties. Source
  5. AheadThe Water Development Board owes the Governor's office an update on enforcement.
  6. AheadThe Texas Commission on Environmental Quality owes the Governor's office an update on the data center permit halt.

Updated

  • Rewrote the page text in plain language and put the answers first: where the data centers are, what each project has said about water and power, whether your county is on the state's investigation list, and what to ask. Missing items now read "Not yet public" once per project instead of in every box.
  • Added a page for each county on the Attorney General's list and each county with a project here, a 10-questions checklist with printable PDFs, a glossary, a page for reporters and researchers, and a free "Is my county on the list?" widget.
  • First version: map, water-and-power table, Lubbock and 806 section, water comparison, downloads and document library. Every box is a sourced value or marked as not yet public.

Common questions

How many data centers are in Texas?

No source gives a complete count. OpenStreetMap contributors have mapped 220 data center objects in Texas as of October 13, 2026, and one campus can be many objects. This page also tracks 22 announced or reported projects. The Attorney General's office said in September 2026 that it is investigating "hundreds" of developments, so the real number is larger than any list here.

Is there a data center in Lubbock?

Yes, a small one. Duos Technologies said on May 19, 2026 that its edge data center at 1634 18th Street was operational. Two larger projects are not built: Project Infrared is proposed, and a 936-acre rezoning request was withdrawn.

How much water would Project Infrared use?

Corva said it would use 1,500 gallons of water a day through a closed-loop cooling system, as KCBD reported July 30, 2026. That is the company's number, not a permit or a measurement. The City's average daily demand is 36.51 million gallons.

What is the Texas water use survey, and why did the Attorney General get involved?

The Texas Water Development Board sends an annual survey to water users, due March 1. State law makes returning it mandatory, with funding and permit consequences and a Class C misdemeanor. On Sept. 24, 2026 the Attorney General announced an investigation of data center developments that had not responded.

Does the Attorney General's county list mean those counties have a problem?

No. The announcement says data centers are under initial investigation in counties including 18 it names, and it names no facilities. The county layer on the map is for orientation only.

How do I add or correct a project?

Use the correction form or the tip form linked below. Please include a link to a company release, a government record or a news report, because every entry here needs a source with a date.

Tools and guides

Free things to use with the map: check your county, a list of questions to ask, word meanings in plain English, and a builder for public records requests. All free to share.

Data centers by county

One page per county: whether it is on the state's investigation list, the projects we track there, and what to ask.

On the state's investigation list

Other counties with a project we track

About this data

Where it comes from
The gray dots come from OpenStreetMap. We ask it for objects in Texas tagged as data centers and drop ones tagged as disused, abandoned, proposed or under construction. OpenStreetMap does not record whether a data center is operating, so we do not say it is. The colored shapes are projects we wrote up by hand from company press releases and investor pages, city and state pages, and named news outlets. Each one lists its sources with dates.
Numbers
A number appears only if a named source said it, with who said it and when. We do not add up, convert or guess numbers. A company's number is not a permit or a meter reading.
Status and place
Status is only what a source supports. "Under construction" needs a source that says ground was broken, site work is underway, or a building has power or was delivered. Locations are approximate: a solid shape means a source describes the spot, and a dashed shape means only a town or county is known.
Limits
No one keeps one complete list of Texas data centers, and this list is not official. Company numbers change, so check the linked source. If the date on an entry is old, treat the entry as old.
Corrections
If something is wrong or missing, send us a link to a source using the form below. We check it before we change the page.
Last checked
Projects were last checked October 2, 2026. The OpenStreetMap dots reflect data as of October 13, 2026.
License
Map data is © OpenStreetMap contributors, available under the Open Database License. See the OpenStreetMap copyright page, the license text. © OpenStreetMap contributors.

Know of a project we missed?

Send us a link to a company release, a government record or a news report. We check it before it goes on this page.

Sources

Every page cited on this one, with the date it was published or the date we opened it.